Reinforcement installation process for continuous reinforced concrete pavement FK mesh panels.
Introduction of the process shortening effect of the FK mesh panel method for continuous reinforced concrete pavement.
Introducing the "Reinforced Concrete Pavement Continuous Rebar Installation Method." The continuous rebar installation for the area to be poured in one day is completed in one day by introducing the FK mesh panel method. NETIS Registration Number: CG-160007-VE NETIS Utilization Evaluation: Promotion of Utilization Technology This method reduces the risk of delays due to adverse weather conditions. Furthermore, it alleviates the burden on workers during operations in extreme heat, allowing for a reduction in the construction schedule by approximately 70%. 【Delivery Achievements】 ■ Shin-Tomei Expressway, Shinshiro Pavement Construction ■ Hamada-Misumi Road, Shirahama District Pavement Construction ■ Nabeyatoge Road, Nabeyatoge Tunnel Pavement Construction (Osaka Side) ■ Nabeyatoge Road, Nabeyatoge Tunnel Pavement Construction (Wakayama Side) ■ Tottori Expressway, Sabuchi Tunnel Pavement Construction, etc. *For more details, please refer to the PDF document or feel free to contact us.
- Company:藤崎商会 本社
- Price:Other